|
|
|
 |

|
|
Data Info |
The National Forwarder packed a 32-ton, 63-foot riser tensioner of deep-sea drilling vessel 'Chikyu' into a Korean Airline 747-400 freighter for Frankfurt on 18 Aug 2007. It took up 12 main-deck pallet positions in the aircraft. A 150-ton crane was required to do this loading. It was a task no other forwarder dared to attempt the handling. |
|

|
 |
|
|
|
|